You’re reading novel The life of Isambard Kingdom Brunel, Civil Engineer Part 40 online at BestLightNovel.com. Please use the follow button to get notification about the latest chapter next time when you visit BestLightNovel.com. Use F11 button to read novel in full-screen(PC only). Drop by anytime you want to read free – fast – latest novel. It’s great if you could leave a comment, share your opinion about the new chapters, new novel with others on the internet. We’ll do our best to bring you the finest, latest novel everyday. Enjoy

The chief alteration, however, was in the arrangement of the hydraulic presses. On November 3, there were, as has been said, two presses. Two additional presses were now provided; each of these consisted of two 7-inch cylinders, and was equivalent to a 10-inch press.

With the object of being able to employ the presses continuously during the descent of the s.h.i.+p, they were arranged to point down the ways at an inclination of 1 in 12. The four presses were placed one on either side of the check tackle at the two ways, and were supported by abutments of timber-work. These abutments each consisted of four rows of piles, one behind the other at intervals of about 8 feet. The press ab.u.t.ted against the row of piles nearest to the s.h.i.+p, which were connected by wooden struts to the piles behind them. Long balks of timber of various lengths were prepared to transmit the pressure to the cradles.[165]

The four presses might be considered equivalent, at their full power, to a force of 800 tons; this was so much in excess of the small force that had moved the s.h.i.+p on November 3, that, even making every allowance for the advantage of the fresh lubrication in the first instance, it seemed reasonable to suppose that with this force the s.h.i.+p could be moved down easily.

As the process of moving the s.h.i.+p with the presses would naturally be a slow one, Mr. Brunel determined to proceed with the operations as soon as everything was ready. On November 19 the work was commenced.[166] The bow tackle was hauled upon first, as the forward cradle was more than a foot behind the after one, and the men at the forward presses were set to work. After a short time the timber backing of the presses began to crack and 'cry out'; and, without much stress on them, the abutments were forced back some 3 or 4 inches. The mooring chain of the bow tackle also gave way, although there was not any excessive strain on it.

On examining the abutments, Mr. Brunel saw the cause of their failure, and ordered the strain to be taken off. The number of piles was sufficient, but the way in which the strain was communicated to them did not enable them to exert the proper amount of resisting power.



This defect was cured by tying the heads of the rearward piles with bolts to the foremost piles. The s.h.i.+p being secured, each press was tested to a full strain, and the adequacy of its abutments ascertained.

It was different, however, with the river tackle. The chain which had parted was an old river mooring-chain of great size. Much delay in replacing it was caused by dense fogs, which made it almost impossible to work on the river. Moreover, there seemed a fatality about every attempt to get a regular trial of any part of the tackle. When, at last, a trial took place, and a strain was put on, a mooring-chain gave way; then this had to be fished up from the bottom of the river, and pieced together, the accident being ascribed to a defective link in the chain.

The trials were, therefore, so few that it was only proved by degrees that all the regular moorings were worthless; although they had large chains which ought to have been good for three times the strain put on them.

The stubbornness of the s.h.i.+p on November 19 gave Mr. Brunel great anxiety; not from any fear of being unable to apply sufficient power to move her, but because, on continued consideration of the subject, he apprehended that a serious difficulty might arise, if there should be a prolonged delay at a particular part of the s.h.i.+p's progress.

It has been explained that Mr. Brunel, with a view of obtaining uniformity of bearing over the surface of the ways, had not attempted to support them rigidly on piles, but had rested them on the river-bank.

As, however, the foundation of the building slip was comparatively rigid, he feared lest an unequal subsidence might cause injury to the s.h.i.+p, if she were stopped for any length of time before she had completely left the ground on which she was built. He thought that if the ways sank at this point they would a.s.sume a slightly convex form, and tend to force upwards the flat bottom of the s.h.i.+p. The main part of the s.h.i.+p's bottom, between the longitudinal bulkheads, could bend in slightly under a heavy upward pressure; but this action could not take place at the transverse bulkheads, as they would not yield without injury. Mr. Brunel shrank from proceeding with the launch without having in reserve such an amplitude of power as would prevent the s.h.i.+p's being stopped at this critical point. This consideration, together with the continued failure of the river tackle under such tests as were applied to it, led him to address the following communication to the Directors:--

November 26, 1857.

We proved two of the presses yesterday afternoon up to the full pressure. A third, the largest, was proved partially; it required some additions, which are nearly completed, and will be in a few hours. The fourth may, I think, also be relied on to the same extent, nevertheless, after a careful examination of the effects of these strains and other circ.u.mstances, I have, after a night's consideration, come to the conclusion that our means are too imperfect to justify my moving the s.h.i.+p with them in their present form. The presses would start the s.h.i.+p, but it is evident that if required to be used constantly, that is repeatedly, the piles would become loosened so as to draw and rise; this again might be remedied by loading, but clumsily, and with other contingencies, which I will report, combine to render it hazardous to depend upon them. My original intention, the right one, was to fit up properly such an hydraulic apparatus as should be fitted to move the s.h.i.+p the whole length of the ways, and to depend upon the whole river tackle only in the event of her moving very easily and for getting her off the ways at the end. From an unwise attempt to economise I determined to dispense with the immediate costly apparatus for pus.h.i.+ng, and by sufficient power merely to move the s.h.i.+p at starting or in the event of sticking, and to depend upon the same river tackle to keep her moving down the ways. The power originally calculated upon for the river tackle has gradually, step by step, failed us; the moorings supposed to be sufficient for certain strains have failed us at one-third of those strains, another has parted since our last attempt, and, instead of full 350 tons of power from this source, we cannot now depend upon 200, and this, added to the inefficiency of the pus.h.i.+ng power, would risk the sticking of the s.h.i.+p, which might occur exactly at a point which would involve serious difficulty to remedy. I am a.s.suming a combination of adverse circ.u.mstances, perhaps not likely to occur, but quite possible; and the conclusion I am compelled to come to is that our apparatus is too defective, and that the original plan of a proper and sufficient hydraulic apparatus, arranged in a complete well-constructed mechanical manner, to push the s.h.i.+p continuously down the ways, ought to have been followed out, and is now the only mode of doing the work safely, that is, without the risk of being involved in a difficulty much greater and more costly.

I have only to add that bad as this report of our condition is, it is at any rate the worst that can be made of it, that nothing whatever has occurred to show that any new difficulty has arisen or anything whatever to create any new difficulty. We could move the s.h.i.+p now if it were wise to do so, but with great doubts whether our pus.h.i.+ng apparatus in its present form, imperfect and unmechanical, would continue effective if repeatedly used, and the certainty that our river tackle is far inferior to what is required, and also of doubtful and more than doubtful permanency for repeated strains, it would not be right to commence....

Mr. Brunel at the same time determined to obtain, on a large scale, a measure of the deflection that might be expected from the weight of the s.h.i.+p coming on the ways. More than 100 tons of kentledge was piled on a portion of the ways 10 feet square, in such a manner as to give a pressure thereon of about double that which would be produced by the weight of the s.h.i.+p.

It was necessary that this test should not be tried on too small a scale, as a weight resting on an isolated patch would receive support from the surrounding ground, which it could not of course do if that ground was equally loaded. The ways sunk so little under the test as completely to rea.s.sure Mr. Brunel, and to show that no serious evil need be contemplated in the pa.s.sage of the s.h.i.+p from off the place where she was built on to the newly made ways, even though she might be again stopped for some time. He therefore determined to go on at once with the launching operations.

The result of the test was very satisfactory to him, and it enabled him to carry on the work with the same confidence as he had at the first felt--'that the s.h.i.+p may stop halfway or not move at all ... but no injury to the s.h.i.+p can result from any failure in the course of proceeding in this mode of launching.'

Shortly before the second attempt to move the s.h.i.+p, on November 19, the experimental cradle had been again put up with a view of obtaining some additional data as to the hauling strain that might be required. The deductions made from them were the same as those obtained in the commencement of the year, and encouraged the hope that the motive power required would not be excessive.[167]

By Sat.u.r.day, November 28, the four presses had been got ready; and the river tackle, though still far from being beyond reproach, had been got into place, and partly tested.

The brakes were eased, and a small amount of slack was overhauled on the check-tackle chains by the men stationed on the ways for that purpose. As on the previous occasion, the pressure was to be first put on the presses at the foremost cradle.

Arrangements were made for promptly following up the s.h.i.+p if she moved freely. A black board was placed on each cradle for recording the progress of the s.h.i.+p.

Mr. Brunel stood on a low platform in the centre of the yard, as a convenient position from which to watch and command the operations. A little before ten he gave the order to commence pumping, and the men at the hydraulic presses got to work. When the pressure came on the timber framing which formed the abutments, there was considerable noise of creaking and crus.h.i.+ng as the several parts subjected to strain came in to their proper bearing. The men soon changed from the large plunger handle to the small one which put on the full pressure; the timbers of the abutments kept on crying out, but it was evident that they were not yielding as they had done before. Presently, while the noise of the timber-work was still attracting attention, the man in charge of the measuring apparatus recorded on his black board a movement of one inch; the s.h.i.+p was again in motion.

She moved steadily, but slowly, under the force of the presses, at a rate of about one inch a minute, and as soon as the forward cradle had been moved about a foot in this way, the presses at the after-ways were set to work, and the river tackle was put into operation, first the bow and stern tackle, and then the four middle purchases. All went well with the presses, but the strain had not been put on long, when the stern mooring-chain and one of the two chains at the bow broke; an anchor at the bow had also begun to drag.

Later in the day part of the moorings of the centre barges also gave way. Captain Harrison set to work to repair these defects as fast as they occurred; in no way dismayed that, as he was at work remedying one mishap, the news of another was brought to him. Barges had to be got into place, the broken ends of cables fished up or under-run and pieced together, and this often in the dark; for it must be remembered that the work was going on at the end of November, when the sun rose, invisible for fog, at half-past seven, and set at half-past four.

With the exception of the river tackle, all had gone well; the presses and their abutments had acted efficiently, and the s.h.i.+p had been moved easily down the ways about 14 feet before work was suspended at night.

Though the progress had not been great, there still seemed a reasonable hope that, by pus.h.i.+ng on, the s.h.i.+p might be got down to the bottom of the ways in time for floating her off at the next spring-tides, namely, on December 2. Mr. Brunel therefore decided to go on with the operation on the Sunday. Early in the morning the presses and crabs were again set to work. The river tackle soon gave way; and, indeed, there was no reason why it should be superior to that used the day before, as almost all that could be done in the night was to piece together the broken chains, and to replace the anchors. The moorings at the bow and stern began at once to drag, and two of the mooring-chains amids.h.i.+ps parted.

The hydraulic presses were then the only available power; and, although the full pressure was put on, the s.h.i.+p did not move. This was very disheartening; it was, however, thought that the resistance was due to some exceptional adhesion. Every effort was therefore made to get together the means of giving the s.h.i.+p a first start.

It was not till the afternoon that a large number of screw-jacks and hydraulic jacks which had been procured were got into place; they were then screwed up hard, and the hydraulic presses being set to work, the s.h.i.+p began to move in a manner very similar to that of the day before.

There was not, however, much daylight left; and, when night came on, the distance traversed was only about 8 feet. The comparative facility with which the s.h.i.+p moved when once started gave hopes that good progress might be made the next day.

On Monday morning the s.h.i.+p moved without more difficulty than when she had stopped the evening before, and the work went on quite satisfactorily. She continued to move slowly, and by dinner-time had gone about 8 feet. Three feet an hour was not much, but still if it could be kept up it would suffice to get the s.h.i.+p down by the next spring-tides. Arrangements were therefore commenced for lighting up the ways and pumping machinery, so that the work might be continued through the night. The repairs of the river tackle were pushed on, the s.h.i.+p's anchors, which had just been finished and tested, were laid down for part of the moorings, and some of the chains were replaced with chains lent by the Government and by Messrs. Brown and Lenox.

When work was recommenced after dinner the s.h.i.+p made a short slip of about 7 inches. On pressure being again applied the 10-inch press at the forward cradle burst. This put an end to all work for the day, and it was then determined to replace the broken press and to add two more presses to each cradle, before proceeding with the launch.

The preparations for the new presses were pushed on vigorously, but it was not till the afternoon of Thursday, December 3, that things were again ready for a start.

The pumps were set to work and the tackle hauled upon. The s.h.i.+p made several short slips of a foot or so, and then moved more than 5 feet at one slide. When darkness set in she had moved about 14 feet, in slips of greater or less length.[168]

On Friday, December 4, all was ready early, and during the morning everything went as well as on the day before; but in the afternoon increased difficulty was found in getting the s.h.i.+p to move, and the 14-inch press at the after cradle burst, as did also a 7-inch cylinder of one of the coupled presses.

Notwithstanding the delay due to the bursting of the presses, the s.h.i.+p was moved some 30 feet; but there was no longer any chance of getting her afloat at the spring-tides, and the increased adhesion gave cause for the fear that still more power would have to be applied.

On the next day, Sat.u.r.day, December 5, the s.h.i.+p made a short slip; but, although the pressure was kept constantly on, no further advance was made until late in the afternoon. Mr. Brunel then tried suddenly letting go the strain on the stern tackle. The sudden relief of the side-way strain on the end of the s.h.i.+p sent a tremor through the hull, which served to destroy the adhesion, and she slid several inches. This operation was several times repeated, and although there were a number of vexatious delays from pus.h.i.+ng-pieces giving way and other mishaps, she was moved by the evening a distance of about 7 feet, the resistance due to adhesion being very great.

On Sunday some of the presses farthest from the cradles were moved down the ways nearer to the s.h.i.+p, so as to avoid the necessity of using long pus.h.i.+ng-pieces, which required much attention to prevent their bulging sideways. The river tackle now consisted of the bow and stern steam-engine purchases, and two crabs and tackle, one at each end of the s.h.i.+p. The moorings opposite the centre of the s.h.i.+p having proved worthless, it was necessary to lay down new moorings, and it was found more convenient to lay them opposite the ends of the s.h.i.+p.

The next day, Monday the 7th, after the commencement of operations, considerable delay was caused by the failure of some of the feed pipes of the presses. These defects were not cured till after dinner-time, when the operations were resumed, and before dark the s.h.i.+p was moved about 6 feet.

On the following morning several short slips were made, and the s.h.i.+p had been moved about 4 feet; but, at 10 o'clock, a dense fog came on, and rendered it impossible to proceed. The next day was occupied in re-arranging the tackle and presses.

These were not ready till the morning of Thursday, December 10; when, on the presses being again set to work, and one of the chains being as before suddenly slackened, the s.h.i.+p made one slip of a little over a foot; but, on the strain being again applied, two of the anchors began to drag. As it was now essential to have the river tackle, in order by shaking the s.h.i.+p to destroy the adhesion, and by the drag of the catenaries to increase the length of the slides, Mr. Brunel determined to dispense with the anchors, and to attach the chain cables to piles connected by framework. These abutments or pulling points for the chains were now constructed on the other side of the river, opposite the bow and stern of the s.h.i.+p.

The launching operations last described, namely, from December 3 to December 10, were full of incident. Nor was the scene wanting in that animation which agreeably interests a bystander, the more so if he is not thoroughly conversant with the meaning of all he sees and hears, so that he mistakes a loudly spoken word, loudly spoken merely that it may be plainly heard, for a prompt and urgent command.

Please click Like and leave more comments to support and keep us alive.

RECENTLY UPDATED MANGA

The life of Isambard Kingdom Brunel, Civil Engineer Part 40 summary

You're reading The life of Isambard Kingdom Brunel, Civil Engineer. This manga has been translated by Updating. Author(s): Isambard Brunel. Already has 612 views.

It's great if you read and follow any novel on our website. We promise you that we'll bring you the latest, hottest novel everyday and FREE.

BestLightNovel.com is a most smartest website for reading manga online, it can automatic resize images to fit your pc screen, even on your mobile. Experience now by using your smartphone and access to BestLightNovel.com